RAPDRP/IPDS


R-APDRP has been initiated by Govt. of India for Reducing AT&C losses in State Owned Electricity Distribution Utilities in India. The Program is divided into two parts Under the Accelerated Power Development and Reform Program (APDRP) launched by Ministry of Power (MOP), schemes for twelve circles were sanctioned. These schemes were focused on Improvement of Sub-Transmission and Distribution System for reduction of energy losses in the system and introduction of State-of-Art Technology in Power System Information Technology for increasing the operational efficiency in the Boards with a view to make them financially viable. The scope for computerization activities kept in the schemes was limited to providing computers at different level for billing purpose only. Provisions were also kept for providing Distribution Planning software at Divisional level and data loggers at each HV/ EHV sub-stations. The Board later decided to keep the centralized architecture for this package

Reliability indices for 14 RAPDRP Towns (Saifi & Saidi)
January 2019
February 2019
March 2019
April 2019
May 2019
June 2019
July 2019

August 2019

Description

Issue Date

Fmt

Corrigendum-V Tender No. HPSEBL(Sectt.)/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-932

11/06/2019

Corrigendum-IV Tender No. HPSEBL(Sectt.)/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-840 31/05/2019
Corrigendum-III Tender No. HPSEBL(Sectt.)/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-727

21/05/2019

Corrigendum-II Tender No. HPSEBL(Sectt.)/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-5687

30/04/2019

IPDS Tender-Amendment No.-VIII

15/03/2019

Corrigendum-XII Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

15/03/2019

Corrigendum-I Tender No. HPSEBL(Sectt.)/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-5902

08/03/2019

IPDS Tender-Amendment No.-VII

08/03/2019

Corrigendum-X1 Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

06/03/2019

NIT E-Tendering mode No.HPSEBL-Sectt/CE(Comm.)/IT Cell/IPDS/RTDAS/VOL.-1/2019-5687

28/02/2019

Corrigendum-X Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

14/02/2019

IPDS Tender-Amendment No.-VI

07/02/20199

IPDS Tender-Amendment No.-V

28/01/2019

Corrigendum-IX Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

28/01/2019

IPDS Tender-Amendment No.-IV

16/01/2019

Corrigendum-VIII Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

16/01/2019

IPDS Tender-Amendment No.-III

04/01/2019

Corrigendum-VII Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

29/12/2018

IPDS Tender-Amendment No.-II

13/12/2018

Corrigendum-VI Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

13/12/2018

Corrigendum-V Tender No. IPDS/IT Phase 2/ITIA/Vol-5/2018

28/11/2018

IPDS Tender-Corrigendum-Amendment-QuerieReply-Annexures

17/11/2018

Corrigendum-IV Tender No. IPDS(IT Phase-II)-07/2018/HPSEBL-3311

01/11/2018

IPDS(IT Corrigendum-2  NIT (ICB) No Phase-II)-07/2018/HPSEBL-1872

10/09/2018

IPDS(IT Corrigendum-1  NIT (ICB) No Phase-II)-07/2018/HPSEBL-1872

08/08/2018

NIT (ICB ) No. IPDS(IT Phase-II)-08/2017/HPSEBL

28/07/2018

Office Order  regarding cancellation of Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL

19/06/2018

Corrigendum-VI Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

20/03/2018

Corrigendum-V Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

03/03/2018

Corrigendum-IV Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

20/01/2018

Corrigendum-III Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

18/12/2017

Corrigendum-II Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

28/11/2017

Corrigendum-I Tender No. IPDS(IT Phase-II)-08/2017/HPSEBL-3488

07/11/2017

Tender Notice ICB : IPDS(IT Phase-II)-0812017/HPSEBL

27/09/2017

Advisory-cum-guidelines to be followed for procuring/ installing meters at Feeder / Sub Station/DTR etc.

22/08/2017

Rewiring of PT Circuit in Sub-Stations feeding town area and DTR wise grouping / binding of consumers in the town area.

18/05/20177

Non Working Automatic Meter Reading (AMR) system locations in 14 towns - Action required by the Nodal Officers of Towns

06/12/2016

Information under IPDS project

20/09/2016

Monitoring of Information Notices Communication regarding R-APDRP Part-A

25/07/2016

Rewiring of PT circuit in 14 towns under R-APDRP Part-A.

15/07/2016

Location for installation of modems in 14 towns under R-APDRP Part-A.

04/06/2016

Town User Acceptance Testing (UAT) templates for R-APDRP Part-A project

26/08/2015

Requirement of power Sockets & earth resistance for installation of equipments in the offices

15/06/2012

Installation of hardware in the 14-towns under R-APDRP (Part-'A') Scheme.

15/06/20122

Methodology for Establishing Baseline AT&C Losses.

04/09/2009

Guidelines for Re-structured Accelerated Power Development & Reforms Programme during XI Plan.

HPSEBL Secured DMLS User Manual

------

Regarding time gap arrangement under R-APDRP (Part-'A') Scheme for the replacement of 'CALMU' Meters.

------

DTR Wise Consumer Grouping of the Shimla Project Area Covered under R-APDRP (Part-'A')

27/07/20111

PAT&C Methodology by PFC

04/09/2009

Supply of Modems at respective division stores in the 14-town under..

14/09/2011

The AT&C losses of 14-towns as verified by TPIEA and approved by M/s PFC

-----

R-APDRP (Re-structured Power Development & Reform Programme)System Meter Annexure-'A'&'B'

-----

R-APDRP (Re-structured Power Development & Reform Programme)System Meter Annexure-'A'&'B'

-----

Diversion of hardware item under R-APDRP part-A Project for Computerized Billing..

30/06/2012

Protection Guidelines for the system meters under R-APDRP (Part 'A'') Scheme

19/07/2012

Purchase of Spot Billing Machines (SBMs) for Computerized Billing.

29/04/2014

Revised LoA-MPLS/VPNoBB connectivity for implementation of IT package.

16/06/20122