TARIFF CATEGORY
Slab (Units/month)/ Contract demand/
Voltage level
Approved Energy Tariff for FY23 (Rs/kWh)**
GoHP Subsidy for FY23 (Rs./kWh)**
Effective Energy Tariff after subsidy (Rs/kWh)**
Domestic Supply (DS)
Lifeline
consumers
0-60
3.50
3.50
0.00
1st Slab
0-125
4.15
4.15
0.00
2nd Slab
0-125
4.15
2.30
1.85
126-300
5.05
1.10
3.95
3rd Slab
0-125
4.15
2.30
1.85
126-300
5.05
1.10
3.95
Above 300
5.65
0.65
5.00
Non-
Domestic Non-Commercial
(NDNCS)
0-20 kVA
5.20
0.20
5.00
Above 20
kVA
4.90
0.20
4.70
Commercial Supply (CS)
0-20 kVA
5.30
0.20
5.10
>20-100kVA
5.05
0.20
4.85
Above 100
kVA
4.95
0.20
4.75
Small Industrial Power Supply (SIP)
0-20 kVA
4.95
0.20
4.75
>20 kVA
4.80
0.20
4.60
Medium Industrial Power Supply
(MIP)
51-100 kVA
4.80
0.20
4.60
Large Industrial Power Supply
(LIPS)
EHT - 220
kV and above
4.40
0.20
4.20
EHT -132
kV and above
4.45
0.20
4.25
EHT - 66
kV and above
4.50
0.20
4.30
HT 1
4.80
0.20
4.60
HT 2
4.55
0.20
4.35
Irrigation & Drinking Water Pumping
Supply (IDWPS)
LT
5.20
0.20
5.00
HT
4.80
0.20
4.60
EHT
4.40
0.20
4.20
Bulk Supply (BS)
LT
5.00
0.20
4.80
HT
4.50
0.20
4.30
EHT
4.30
0.20
4.10
Street Lighting Supply
(SLS)
5.15
0.20
4.95
Temporary Metered Supply
(TMS)
0-20 kVA
7.20
0.20
7.00
> 20-200
kVA
6.50
0.20
6.30
Railway
Traction
> 20kVA
4.90
0.20
4.70
TARIFF CATEGORY | Slab (Units/month)/ Contract demand/ Voltage level | Approved Energy Tariff for FY23 (Rs/kWh)** | GoHP Subsidy for FY23 (Rs./kWh)** | Effective Energy Tariff after subsidy (Rs/kWh)** | |
---|---|---|---|---|---|
Domestic Supply (DS)
|
Lifeline consumers |
0-60 | 3.50 | 3.50 | 0.00 |
1st Slab | 0-125 | 4.15 | 4.15 | 0.00 | |
2nd Slab |
0-125 | 4.15 | 2.30 | 1.85 | |
126-300 | 5.05 | 1.10 | 3.95 | ||
3rd Slab |
0-125 | 4.15 | 2.30 | 1.85 | |
126-300 | 5.05 | 1.10 | 3.95 | ||
Above 300 | 5.65 | 0.65 | 5.00 | ||
Non- Domestic Non-Commercial (NDNCS)
|
0-20 kVA | 5.20 | 0.20 | 5.00 | |
Above 20 kVA | 4.90 | 0.20 | 4.70 | ||
Commercial Supply (CS)
|
0-20 kVA |
5.30 |
0.20 |
5.10 |
|
>20-100kVA | 5.05 | 0.20 | 4.85 | ||
Above 100 kVA | 4.95 | 0.20 | 4.75 | ||
Small Industrial Power Supply (SIP) |
0-20 kVA | 4.95 | 0.20 | 4.75 | |
>20 kVA | 4.80 | 0.20 | 4.60 | ||
Medium Industrial Power Supply |
51-100 kVA
|
4.80
|
0.20
|
4.60
|
|
Large Industrial Power Supply
|
EHT - 220 kV and above | 4.40 | 0.20 | 4.20 | |
EHT -132 kV and above | 4.45 | 0.20 | 4.25 | ||
EHT - 66 kV and above | 4.50 | 0.20 | 4.30 | ||
HT 1 | 4.80 | 0.20 | 4.60 | ||
HT 2 | 4.55 | 0.20 | 4.35 | ||
Irrigation & Drinking Water Pumping Supply (IDWPS)
|
|||||
LT | 5.20 | 0.20 | 5.00 | ||
HT | 4.80 | 0.20 | 4.60 | ||
EHT | 4.40 | 0.20 | 4.20 | ||
Bulk Supply (BS)
|
LT | 5.00 | 0.20 | 4.80 | |
HT | 4.50 | 0.20 | 4.30 | ||
EHT | 4.30 | 0.20 | 4.10 | ||
Street Lighting Supply (SLS) |
5.15 | 0.20 | 4.95 | ||
Temporary Metered Supply (TMS) |
0-20 kVA | 7.20 | 0.20 | 7.00 | |
> 20-200 kVA | 6.50 | 0.20 | 6.30 | ||
Railway Traction |
> 20kVA | 4.90 | 0.20 | 4.70 |